1Z0-1075-21 Dumps To Pass Manufacturing Cloud Exam in One Day (Updated 65 Questions) [Q22-Q47]

Share

1Z0-1075-21 Dumps To Pass Manufacturing Cloud Exam in One Day (Updated 65 Questions)

1Z0-1075-21 Exam Brain Dumps - Study Notes and Theory


Oracle 1Z0-1075-21 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Set up and implement Cost Planning estimates
  • Describe and Compute Production Costs
  • Explain Work Execution Work Areas
Topic 2
  • Evaluate a Work Order completion cost, including Partial and Scrap
  • Explain Production Transaction Review and Product Genealogy
Topic 3
  • Create and update Work Orders for standard and non-standard Work Orders and Serialized Manufacturing
  • Set up Plant Parameters and Security, Profile Options, Lookups and DFFs
Topic 4
  • Describe Managerial Accounting Basics & Cost Accounting
  • Explain Work Order Reservations and History
Topic 5
  • Explain Cost Reporting, including WIP Inventory Valuation Report
  • Configure Resources, Operations, and Work Centers
Topic 6
  • Describe Production Execution transactions (including Outside Processing)
  • Describe Functional Set Up Manager and Simplified Setup
Topic 7
  • Execute Basic Transaction and Work Order Reporting
  • Explain Common Projects Enabled SCM Configurations
Topic 8
  • Manage Production Calendars and add Shift and Work Center Resource exceptions
  • Describe how work definition is automatically generated

 

NEW QUESTION 22
An employee is responsible for dealing with different manufacturing practices and processes, machines, tools and equipment that turn raw material into a product.
Which seeded job role must this employee be provided with?

  • A. Production Operator
  • B. Production Supervisor
  • C. Production Engineer
  • D. Manufacturing Supervisor
  • E. Manufacturing Engineer

Answer: E

 

NEW QUESTION 23
Your Customer has implemented Oracle Cloud Manufacturing and the Manufacturing user is in the process of defining Work Definition and Operations. However, this user is unable to assign an ad hoc item, Grease, to an operation.
Identify the reason.

  • A. The user doesn't have Data access to create item structure.
  • B. An itemcannot be assigned on an ad hoc basis.
  • C. The user doesn't have Override Item Structure Components in the Work Definition privileges.
  • D. The user doesn't have access to the PIM module.

Answer: B

 

NEW QUESTION 24
Your customer plans to use Oracle Representational State Transfer (REST) API with Oracle Supply Chain Management Cloud (Oracle SCM Cloud) to support integration requirements.
Identify four REST resources and thecorresponding HTTP action available with Manufacturing Cloud.

  • A. Resource transaction POST method
  • B. Resource transaction GET method
  • C. Work Orders GET method
  • D. Work Order Status POST method
  • E. Work Order Status GET method
  • F. Work Orders PATCH method

Answer: A,C,E,F

 

NEW QUESTION 25
A manufacturing plant works for two shifts of 8 hours each. The Manufacturing user wants a work center resource R1 of 4 units to be available during a nonworking time outside the regular shift on a particular day.
Identify the sequence of steps to create a resource exception in the Manage Work Center Resource Calendar page.

  • A. Click Inside the existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability region> Populate 4 units inDefault Availability column.
  • B. Click Outside the existing Shift time on a Specific Date> Create Work Center page> Click the Resource Availability tab> Click Add icon> Select R1 from Resource Drop-down list> Enter 4 in Default Units Availability column.
  • C. Click Outsidethe existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability and Overrides Region> Populate 4 units in Availability Override column.
  • D. Click Inside the existing Shift time on a Specific Date>Create Work Center page>Click the Resource Availability tab>Click Add icon> Select R1 from Resource Drop-down list> Enter4 in Default Units Available.

Answer: C

 

NEW QUESTION 26
A plant operates three continuous daily shifts of eight hours each for five days in a week. One unit of the resource R1 within the plant is assigned for two shifts to work area W1. On a particular day in a given week, due to unscheduled maintenance that needed to be performed on the resource R1, it was not available for two hours during each of the assigned shifts.
Determine the available capacity of the resource R1 for thatweek.

  • A. 60 hours
  • B. 78 hours
  • C. 76 hours
  • D. 70 hours

Answer: B

 

NEW QUESTION 27
You want to use a predefined Standard Operation in a Work Definition, but you also want to change the usage of the Standard Operation resource. Identify the setup required.

  • A. Use a Resource exception for the resource and alter its usage.
  • B. Select the Referenced check box while adding the standard operation to the work definition and change the usage manually.
  • C. Deselect the Referenced check box while adding the standard operation to the work definition and change the usage manually.
  • D. Use the Transfer and Edit Standard Operation functionality to edit the resource usage.

Answer: B

 

NEW QUESTION 28
The Manufacturing Engineer, responsible for creating and maintaining the Work Definitions, hasscheduled the Process Item Structure Changes to Work Definitions program. However, after the execution of the program the engineer did not receive a notification with the details of the Item Structure changes.
Which two reasons could cause this?

  • A. The engineer does not have Data access to Items Attributes.
  • B. The engineer does not have Dataaccess to Item Structures.
  • C. The engineer does not have Data access to Manufacturing plant in which the Item Structure change was performed.
  • D. The engineer does not have the Manage Work Definitions function privilege.
  • E. The engineer does not have Data access to Items.

Answer: C,D

 

NEW QUESTION 29
A production Supervisor has noticed that Work Orders created manually are overwritten by the plan runs executed by Planning Central. After discussing this issue with the Planner, two actions are recommended to prevent the Work Orders from being overwritten by plan runs.
Identify the two recommendations.

  • A. Update Firm flag in the Details region of the Edit Work Definition Names page.
  • B. Update Supply Plan Options, Overwrite Firm Planned Orders = None.
  • C. Update Firm flag in the Details region of the Edit Work Definition page.
  • D. Update Firm flag in the Details region of the Edit Work Order page.

Answer: B,D

 

NEW QUESTION 30
Which two steps should you use to create a new Oracle Transactional Business Intelligence report in the ManufacturingCloud?

  • A. Use Business Intelligence publisher to create a template anduse that template to create the report.
  • B. Use the Manufacturing subject area to select the report columns and create the report.
  • C. Use ibots to create the report.
  • D. Use Business Intelligence answers to create the report.

Answer: A,D

Explanation:
Explanation
You can use Oracle Transactional Business Intelligence to create analysis and Oracle Business Intelligence Publisher to create reports.

 

NEW QUESTION 31
You arereviewing the production status of your manufacturing plant shop floor as a production supervisor.
Your production manager wants a report on a work order status which is reserved against a particular customer. The final assembly of the work order is serialized.
Which option shows the steps to complete the task using the mobile application?

  • A. Search the work order by customer name to open the work order details page> Click Actions and select the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient's e-mail, andclick Send.
  • B. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode to open the work order details page > Click Actions and select the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient's e-mail, and click Send.
  • C. Select the infotile Customer to open the work order details page> Click Actions and select the E-mail icon> Select required work orders>Select the e-mail client, enter the recipient's e-mail, and click Send.
  • D. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode to open the work order details page> Select required work orders> Click Social icon (OSN) > Select recipient, and click Share.

Answer: B

 

NEW QUESTION 32
The Cost Accountant has reported to the Production Supervisor that the Work Order transactions are not getting transferred to Costing.
Identify the reason for work order transactions not getting transferred to Costing.

  • A. The item was made inactive after the Work Order transaction.
  • B. The Manage Item Rules setup is not complete.
  • C. The Costing Interfaced Attribute is enabled in the resource definition.
  • D. The Costing Interfaced Attribute is not enabled in the resource definition.

Answer: D

 

NEW QUESTION 33
Identify two reports that provide work ordercost-related information to the costing user.

  • A. WIP Balance by Plant
  • B. Purchase Variance Summary
  • C. Work order Operational Analysis
  • D. Cost Accounting Dashboard

Answer: C,D

 

NEW QUESTION 34
As a production supervisor, you require immediate access to critical shop floor execution systems to take actionwhile on the go.
Which four work order related actions can be taken in the Manufacturing Supervisor mobile application?

  • A. Searching for work orders and sending them through e-mail
  • B. Reviewing customer information of work orders
  • C. Reviewing operation, component, and resource detail
  • D. Executing standard work order and updating item and resource usage
  • E. Releasing work orders using quick swipe details
  • F. Creating a new standard or non standard work order

Answer: A,B,C,E

 

NEW QUESTION 35
Your customer has defined the work definitions. They have created and saved a new version for the work definition and want to edit that work definition.
Which two attributes cannot be updated using the Edit Work Definition Details action?

  • A. State Date
  • B. CostingPriority
  • C. Version
  • D. Production Priority

Answer: A,C

 

NEW QUESTION 36
Work order costs are computed based on material and resource transactions reported and the cost method of the product. In a manufacturing plant, the production operator has completed a work order WO-001 ensuring proper materials and resource transactions. The materials are costed and resources are defined with rates.
A cost accountant has created cost accounting distributions. Upon reviewing the accounting distributions of the work order WO-001, resources charged to the work order are missing.
Identify the Concurrent Request that needs to be submitted to transfer resource charges to cost accounting.

  • A. Transfer Transactions from Production to Costing
  • B. Transfer Costs to Cost Management
  • C. Transfer Transactions from Inventory to Costing
  • D. Create accounting

Answer: A

 

NEW QUESTION 37
Identify three entities that must be set up in Oracle Manufacturing Cloud to create a Work Definition for an item that will be manufactured in-house.

  • A. Resources
  • B. Operations
  • C. Operation Items
  • D. Manufacturing Lead Time
  • E. Production Line

Answer: A,B,C

 

NEW QUESTION 38
In a manufacturingcloud implementation, production operators want to perform work order updates using Dispatch List.
Identify two tasks that the Dispatch List allows the production users to perform.

  • A. Report Material Transactions by Quantity and Serial Number
  • B. Report Cost Transactions
  • C. Report Receipts
  • D. Report Component Returns
  • E. Report Resource Transactions

Answer: A,E

 

NEW QUESTION 39
You are in the process of defining a Standard Operation for visual inspection. You want the completion of this standard operation to be reported in all work orders that reference it.
Identify the setup that will fulfill this requirement.

  • A. Deselect the Count Point check box while defining the Standard Operation.
  • B. Select the Automatically Transact check box while defining the Standard Operation.
  • C. Ensure that the Charge Type of the resource is Automatic.
  • D. Select the Count Point check box while defining the Standard Operation.

Answer: D

 

NEW QUESTION 40
Planning Central has collected manufacturing data for a Work Order WO-2045 (Make Item AS1000), where actual duration of work order is 2 days. Item AS1000 manufacturing lead time is 1.25 days.
A plan is run and the Work Order WO-2045 is rescheduled.
Identify the duration of the rescheduled Work Order WO- 2045.

  • A. Rescheduled Work Order WO-2045 duration = 2 days
  • B. Rescheduled Work Order WO-2045 duration = 0.75days
  • C. Rescheduled Work Order WO-2045 duration = 1.25 days
  • D. Rescheduled Work Order WO-2045 duration = 3.25days

Answer: B

 

NEW QUESTION 41
In a Manufacturing Cloud post productionsupport environment, a user wants to update some of the operations in the work orders by using the Midpoint Scheduling feature. However, the user is unable to update any of the orders.
Identify two reasons.

  • A. The scheduled resources are not part of the organization selected by the user.
  • B. None of the operations include scheduled resources.
  • C. The operations are missing sequence.
  • D. The work order operations do not have operations start or completion date.

Answer: B,C

 

NEW QUESTION 42
During a Manufacturing Cloud implementation, the customer request to develop Oracle Transactional Business Intelligence reports that are not available out-of- the box.
Identify the tool that is available to the Report Developer in Manufacturing Cloud to develop the reports.

  • A. Oracle Business Intelligence Application
  • B. Oracle Business Intelligence Standard Edition
  • C. Oracle Business Intelligence Publisher
  • D. Oracle Business Intelligence Enterprise Edition

Answer: C

 

NEW QUESTION 43
Identify two conditions that should be met at the same time for a Standard Operation to be called an Optional Operation.

  • A. The Automatically Transact check box is deselected.
  • B. The Automatically Transact check box is selected.
  • C. The Count Point check box is deselected.
  • D. There are no components attached to it.
  • E. The Count Point check is selected.

Answer: A,C

 

NEW QUESTION 44
A manufacturing cloud user wants to print information available in the work order in PDF.
Identify the three reports that the user can print directly from the work order screen using the Print PDF action.

  • A. Work Order Traveler
  • B. Print Component List
  • C. Print Labels
  • D. Resource List
  • E. Bill of material

Answer: A,B,C

 

NEW QUESTION 45
Your customer is a light assembly manufacturing company that doesn't require shop floor control. A manufacturing engineer wants to generate a work definition automatically for some items, and wants to eliminate the explicit maintenance of work definitions.
Which three steps must be completed and verified in the Work Definition area?

  • A. Select a standard operation that is to be used in automatic work definition by enabling the attribute Default for automatic work definition.
  • B. Select a resource that is to be used inautomatic work definition by enabling the attribute Default for automatic work definition.
  • C. Ensure the item isa standard item with a secondary item structure.
  • D. Ensure there is only one default standard operation at a given point in time.
  • E. Ensure the predefined work definition name ORA_MAIN name is active.

Answer: A,C,E

 

NEW QUESTION 46
Identify the two configurations in Supply Chain cloud applications of Product Information Management (PIM) and Order promising (GOP), which must be set to process the Back-to-Back order with Make Supply Order, for a nonstocked item.

  • A. Create Supply Order Orchestration Defaulting and Enrichment Rule for the nonstocked item.
  • B. Set a local sourcing rule in GOP to determine supply creation option as Make.
  • C. Create Supply Chain Orchestration Supply Execution Document Creation Rule for the nonstocked item.
  • D. Set the nonstocked item to be back-to-back enabled in Product Information Management (PIM).
  • E. Set the global sourcing rule in GOP to determine supply creation option as Make.

Answer: D,E

 

NEW QUESTION 47
......

1Z0-1075-21 Dumps PDF - Want To Pass 1Z0-1075-21 Fast: https://pass4itsure.passleadervce.com/Manufacturing-Cloud/reliable-1Z0-1075-21-exam-learning-guide.html